Skip to content

What is built and what is not yet.

In development. You cannot use pro2desk yet.

Write to hello@pro2desk.com

15 of 32

  • work packages merged as code
  • None of it in operation

Five parts and where they stand

The 32 work packages are the first slice for real operation: from signing in to the immutable invoice.

What the three signs mean
Built
Merged and checked on one machine. Not in operation.
Designed
Drawn as a screen or described. Its core is not built yet.
Planned
Decided, not begun.
  • Tenant-safe dataBuiltFour barriers hold for every row and every route: workspace, unit, role, person.

    41 capabilities stand in a closed registry: 36 of the workspace, 5 of the person. The database enforces row-level security; no role of the application may bypass it.

    What somebody may not know answers like an invented id: “not found”. A matrix checks this for every route with 14 actors.

  • One way for every changeBuiltEvery change is a command: authorized, repeatable without a second effect, with a receipt.

    The same command with the same key returns the same receipt, byte for byte. The events of a command are written in its transaction: if it is rolled back, they have not happened either.

    A limit today: if the newest entries of the audit chain are removed together with the counter, nobody notices. An anchor outside the database is still missing.

  • Without signalDesignedThe phone will remember every action and send them later, in their order.

    Built is the way for every change on the server. The sync routes, the part on the device and the upload of photos are still missing.

    No ready-made sync software is used: every change is to pass the same check of permissions.

  • Documents and e-invoicePlannedOne program for every paper, our own code for the e-invoice, a public validator in the tests.

    Every paper becomes a PDF/A-3 with the invoice file attached. Which e-invoice profile applies is for legal counsel to say.

    There is no code for this yet, and no validator has run.

  • Limits for LotPlannedA gateway of our own in front of every model. Models only from hosts in German hands, with no silent switch.

    The hosts process in Germany. If one fails, nothing switches silently to another provider or another country.

    Without a model the work stays possible: the first product does without a model.

    See Lot

A conflict stays visible.

If the phone and the office change the same value, both will stand there until a person decides. Nothing is overwritten silently.

Designed
pro2desk, today in the office: settling a conflict. Copper pipe 15 mm, Sonnenhof 112. Phone: 2.5 m, Katrin Weiss, yesterday 11:40. Office: 3.0 m, Aylin Şahin, yesterday 12:05. Below it the button Entscheiden (decide).
How it will look. A design with sample data; the screens are in German.
pro2desk, today on the phone: settling a conflict, Sonnenhof 112. Phone 2.5 m, office 3.0 m.
How it will look. A design with sample data; the screens are in German.

What it is built with

Four layers are settled. Three decisions are still open.

  • Web

    Designed

    One web app on a shared kit

  • Phone

    Planned

    Shells around the same web app

  • API and worker

    Built

    One module; the contract comes before the code

  • Database

    Built

    Relational, with enforced row-level security

Three open decisions
  • Sign-in

    Under review

    Through OpenID Connect; which service is under review

  • Hosting

    Proposed

    One data centre in Germany

  • Payments

    Proposed

    One payment service; each firm is the merchant itself